Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/entophne/smiaceb/wp-includes/functions.php on line 6121

Deprecated: Function create_function() is deprecated in /home/entophne/smiaceb/wp-content/themes/smiaceb/functions.php on line 252
PPRE Risle : Phase de travaux sur le tronçon RI 05 – Syndicat de la Risle et Charentonne Skip to main content
La Risle et vous

PPRE Risle : Phase de travaux sur le tronçon RI 05

By 3 octobre 2022octobre 11th, 2022No Comments

Sur les secteurs :

  • Risle 05 sur les communes d’Echauffour, Sainte-Gauburge-Sainte-Colombe, Saint-Pierre-des-Loges, Saint-Hilaire-sur-Risle, Beaufai et Aube

Travaux :

  • Entretien et restauration de la ripisylve (végétation aux abords des cours d’eau), retraits des embâcles
  • Equipement des prairies : clôtures, abreuvoirs, dispositifs de franchissement du cours d’eau

Ces travaux sont réalisés avec le soutien financier de l’Agence de l’Eau Seine Normandie